Theses and Dissertations
Advisor
Sescu, Adrian
Committee Member
Martin, Stanley
Committee Member
Narsipur, Shreyas
Date of Degree
5-15-2026
Original embargo terms
Immediate Worldwide Access
Document Type
Graduate Thesis - Open Access
Major
Aerospace Engineering
Degree Name
Master of Science (M.S.)
College
James Worth Bagley College of Engineering
Department
Department of Aerospace Engineering
Abstract
This research investigates the intricacies of ship simulation and developmental processes for integrating wet gap crossing capabilities into a simulated environment. The US Army Mark III Bridge Erection Boat (BEB) and Improved Ribbon Bridge (IRB) were modeled in commercial off the shelf (COTS) and Government Co-Owned (GCO) navigation software suites to determine their performance capabilities and limitations. Each model was constructed using naval architecture concepts to accurately capture their hydrostatic and hydrodynamic effects before being validated against available performance data and expert elicitation from expert US Army watercraft operators. Models were configured and tested in simulated river flows with current speeds ranging from 0 to 4 knots. Analysis of simulation exercises highlight a successful implementation of BEB/IRB operations for the conventional rafting configuration and limited success for the longitudinal rafting configuration. Simulation results demonstrated the benefits for use as a training and operational planning tool, preparing personnel for potential challenges in a low-risk environment
Sponsorship (Optional)
U.S. Army Corps of Engineers Engineer Research and Development Center
Recommended Citation
Hodges, Jacob C., "Developing and evaluating U.S. Army bridging for ship simulation" (2026). Theses and Dissertations. 6914.
https://scholarsjunction.msstate.edu/td/6914